April 2017

  • Outer Wing Repair
    • Unable to now contact Ron Maddox from Ugly Blasters in order to schedule the blasting of the wing section. I have inquiries out to two more companies, awaiting their reply.
  • Bulkhead Channels
    • Bulkhead pieces are still being cut and drilled, with the finished pieces being etched and Alodined.
  • C-47
    • Continued work on installation of newly recovered cockpit panels.
    • Completed repair of inner and outer door.
    • Battery elevators reconditioned including corrosion mitigation.
    • New wooden battery trays constructed.
    • Repair stuck rudder trim tab
  • Bonanza
    • Assisted Bob with replacement of defective nozzle.
    • Fabricated special tool for removal and installation of nozzle. (copy of borrowed tool)

 BULKHEAD-1 BULKHEAD-2C47-1 C47-2 C47-3 C47-4 C47-5 C47-6 C47-7

BONANZA-1 BONANZA-2 BONANZA-3