B-17 LIBERTY BELLE SEPTEMBER 2017

Sept 2017

  • Continued work on throttle quadrant
  • All pulley assemblies removed from throttle quadrant
  • Each pulley inspected and serviced where required
  • All pulleys cleaned and repainted
  • Steel pulley shafts cleaned, inspected and polished
  • Phenolic and aluminum spacers and friction discs cleaned and inspected
  • Steel parts zinc plated where needed
  • Stripped throttle quadrant repaired where needed, blasted, and repainted

1

5 2 3 4  6 7 8 9 10 11 12