Brook’s B-17 FEBRUARY 2017

February 2017

  • Outer Wing Repair
    Work continued on repairing the outer wing.
    We received the hardness tester last week and have begun evaluating the wing’s structure for air-worthiness.
  • Landing Gear Retract Step and Bomb bay lower skin ribs. Completed the starboard side ribs and landing gear retract step. The port side (Lake plane) will be sent to Ray Moore as he has access to a suitable sheer and brake to fabricate the skins.
  • Assisted Bob Harless. Assisted Bob removing ski parts from the C-47

 

February 2017

  • Continue work on the outer wing.
  • Resume work on throttle quadrant.
  • Continue assistance where needed on the C-47.
Outer Wing

Outer Wing

Outer wing bottom skin removal

Outer wing bottom skin removal

Bomb bay-10 Bomb bay-9Original bomb bay lower skin ribs

Original bomb bay lower skin ribs

Bomb bay lower skin rib

bomb bay lower skin ribs

Bomb bay lower skin ribs

Bomb bay lower skin rib. All ribs made from T-3

Bomb bay lower skin rib. All ribs made from T-3

Bomb bay lower skin rib

Bomb bay lower skin rib

Bomb bay lower skin rib

Bomb bay lower skin rib

Bomb bay lower skin rib

Bomb bay lower skin rib

Bomb bay-12Bomb bay lower skin ribs and landing gear retract step

Bomb bay lower skin ribs and landing gear retract step

Bomb bay-7

All ribs completed