Brook’s B-17 MARCH 2017

February 2017

  • Outer Wing Repair
    • Work continued on repairing the outer wing.
    • Researching the use of Dustless Blasting to remove soot and paint. Waiting for quotes and more information.
  • Work on Throttle Quadrant
    • Work on throttle quadrant has resumed.
    • New panels fabricated, original panels and parts reconditioned where possible.
  • Bulkhead Channels
    • Bulkhead pieces sorted and wrapped. Each bundle represents one bulkhead.  Sets stored on shelves.
    • Began the cutting and drilling process using the fiberglass templates.
  • C-47
    • New cockpit panels fabricated where needed.
    • Modified gear handle latch per Bob.
  • White Tug
    • Rebuilt master cylinder, brakes are operational now.
    • Replaced transmission lines, radiator hoses and belt.
    • Wired alternator and sorted previous wiring problems.
    • Tug is now in service.
  • Bonanza
    • Installed HSI.
    • Installed glare shield.
    • Replaced broken warning horn in glare shield.
    • All work done under supervision by Bob Harless.

March 2017

  • Continue work on the outer wing.
  • Continue work on bulkheads.
  • Continue work on throttle quadrant.
  • Continue assistance where needed on the C-47.
Throttle quadrant under repair/restoration

Throttle quadrant under repair/restoration

THROTTLE-1 THROTTLE-2 THROTTLE-3 THROTTLE-4 THROTTLE-5 THROTTLE-6 THROTTLE-7 THROTTLE-9 THROTTLE-10 THROTTLE-11

C-47 Landing Gear Latch Modification

C-47 Landing Gear Latch Modification

C-47 New Cockpit Panel

C-47 New Cockpit Panel

C-47 New Cockpit Panel

C-47 New Cockpit Panel

Bulkhead blank ready for drilling

Bulkhead blank ready for drilling

Sorted bulkhead sets

Sorted bulkhead sets